Time:2024-06-14 Views:1 source:News

1. Remove the large side panel cover, right small side panel, upper cover plate, and front support rod.
2. Remove the two screws above the feed side plate and the discharge side plate, loosen the lower screw, and let the front and rear side plates fall naturally. (Note: When disassembling or loosening screws, two people need to cooperate. One person should disassemble and the other should lift the side panel in front of it to prevent it from suddenly falling, and then gently lower it.)
3. Remove the springs on both sides and take out the upper and lower tension rollers.
4. Remove the upper and lower screws connecting the right wall panel.
5. Use a dedicated lifting rod for changing belts to lift the upper and lower right wall panels.
6. Two people work together to remove the upper and lower conveyor belts.
7. Replace the conveyor belt with a new one, which is the opposite of the previous process operation.
Read recommendations:
high frequency welding machine paper card plastic blister packaging
Automatic rotary table high frequency welding machine with card loading and take out robot
HF Polyester welder Processing.Why are leather embossing machines widely used?
HF PVC bag welding machine supplier.Market trends and advantages of metal grade machines
Complete control over products allows us to ensure our customers receive the best qualityprices and service. We take great pride in everything that we do in our factory.